Skip to main content
LianXiang Cooling Tower

About us

About Zhejiang Guoxiang

Cooling-tower products, technical information and a clear route to discuss your project.

About the company

Zhejiang Guoxiang Cooling Technology Co., Ltd.

Zhejiang Guoxiang Cooling Technology Co., Ltd. presents open-circuit, closed-circuit and heat-source cooling towers on this website. Buyers can compare the product ranges, view real equipment photographs and review representative model data before discussing their operating conditions and project requirements through the inquiry form.

What we present

This site brings together open-circuit, closed-circuit and heat-source cooling towers. The product pages show equipment photographs, structural features and representative model information where the source conditions are known.

How to start a discussion

Start with the water circuit and intended duty, then share flow, temperatures, fluid and installation details through the inquiry form. Drawings and project requirements help frame a more specific equipment conversation.

How the systems differ

Follow the fluid path

01

Open circuit

Circulating water is distributed over fill and meets the air directly. The catalog includes square crossflow, square counterflow and round counterflow arrangements.

View products
02

Closed circuit

Process fluid remains inside a coil while a separate spray-water circuit and moving air remove heat. Counterflow, crossflow and combined-flow layouts can be compared.

View products
03

Heat-source circuit

The heat-source tower range is intended for systems needing summer cooling and winter heat-source operation. Confirm the seasonal duty before selecting a configuration.

View products

Before selection

The details that make a quotation useful

Catalog model values are reference points. Final equipment selection depends on the actual design conditions and the site.

01

Thermal duty

Provide flow, inlet and outlet temperatures, and the design wet-bulb condition.

02

Circuit & fluid

Identify whether the process can use an open water loop or needs fluid isolated inside a coil.

03

Site & airflow

Share the installation position, ventilation clearance and any discharge constraints.

04

Arrangement & dimensions

Review footprint, height, access space and whether single or modular units suit the site.

05

Project documents

Send drawings and list inspection and documentation items to discuss for the order.

Continue exploring

From product data to a project conversation

Review individual tower pages for structures and representative model data, then share operating conditions and drawings for discussion.