Skip to main content
LianXiang Cooling Tower

Manufacturing

Fabrication, assembly and inspection in one site

The Shaoxing facility combines metal processing, welding, fill production and finished-equipment checks.

Cooling tower manufacturing workshop
01

Laser processing

Profile cutting of sheet and plate parts.

02

CNC bending

Formed sheet parts bent on CNC equipment.

03

Plasma cutting

Thermal cutting of heavier steel parts.

04

Sawing

Sections and profiles cut to length.

05

Punching

Holes and slots formed in sheet and structural parts.

06

Gas-shielded welding

Joining of fabricated frames and assemblies.

07

Fill production

Fill for the water and air heat exchange inside the tower.

08

Test instruments

Instruments used to check components and finished equipment.

Project flow

1

Share requirements

Send flow, temperatures, fluid, site and quantity through the inquiry form.

2

Engineering selection

We review your conditions and propose a tower type and arrangement.

3

Production

Parts are cut, formed, welded and assembled at the Shaoxing site.

4

Inspection

Components and finished equipment are checked before they leave the factory.

5

Shipment

Packing and dispatch are coordinated with you for your destination.